Work fronts work quickly during records made this Saturday (5)
The international bridge that will connect Mato Grosso to Sul with the Bioceaniczna route, located in Porto Murtinho, the commune of 439 kilometers from Campo Grande, arrived on Saturday (5) on 126 meters on the Brazilian side, leaving only four meters per 130 meters.
The proof of this is the album made by the photographer Toninho Ruiz. Work fronts work quickly and employ hundreds of employees. According to the provisions, this Saturday, the intensive movement of employees and machines spread throughout the entire episode.
Advance work as part of an investment in the amount of 472 million R $ with PAC (growth acceleration program). Construction is coordinated by the day (National Department of Transport Infrastructure) and made by the PDC Fronteir consortium, created by Caiapó, Pauletec and DP Barros.
On the side of Paraguay, the bridge access holder was already five kilometers to Bid Bioceanic Route Asphalt. In Brazil, the 13.1 km handle develops as pillars and working services on BR-267.
With a length of 1294 meters, the bridge is divided into three sections. Two are access viaducts on both banks of the river, and one corresponds to the given part, measuring 632 meters, with a central span of 350 meters.
As reported, the work aims to consolidate the road corridor between Brazil, Paraguay, Argentina and Chile. The new connection is expected to transform the region into an export logistics axis with reflections on the local economy.
Check out the images gallery:
( *) Toninho Ruiz cooperated.
Receive the main message about the state on the mobile phone. Download the Campo Grande News application HERE And follow in social networks: FacebookIN InstagramIN Thicket AND WhatsApp.
Leave a Reply